Description
Shurbond Topcoat Hardener M-15000 is designed to be paired directly with our specially formulated Shurbond Topcoats. Remember, all Shurbond Topcoats need 15000 Hardener.
- Cure Time: 24-36 hours
Mix Ratio: Usage per bathtub:
3 parts Part A (topcoat base color) 9 oz.
1 part Part B (hardener M-15000) 3 oz.
1 part Part C (reducer as needed) 4 oz.